EV Charging Grants for Schools and Businesses: What You Can Claim Before 31 March 2027
Yes, schools and businesses across the UK can still claim EV charging grants, but the scheme is in its final year and closes on 31 March 2027. State-funded schools and colleges can claim up to £2,000 per socket, covering up to 75% of purchase and installation costs, for up to 40 sockets. That is a maximum of £80,000 per school.
Businesses, charities and public sector organisations can claim up to £500 per socket under the standard Workplace Charging Scheme, run by OZEV (the Office for Zero Emission Vehicles).
The good news? The funding is confirmed, the process is simpler than most people expect, and the first step costs you nothing.
The challenge? Timing. A voucher is valid for 180 days from the day it is issued, and you need a site survey, an application and an authorised installation inside that window. Start now and there is comfortable time to do all three.
Grant rates and dates are correct as of November 2026. We check the GOV.UK guidance before every survey, because the rules do change.
Who This Guide Is For
This guide is written first for School Business Managers and Estates Leads in schools, colleges and multi-academy trusts. You manage sites with staff and visitor parking, you answer to governors on both budget and sustainability, and you do not need another complex project on your desk.
It is also for Managing Directors and Facilities Leads at SME sites, typically 20 to 100 staff, with off-street parking and growing pressure from employees and clients to provide charging.
Both groups share a problem. The funding is real, the closing date is real, and internal approval usually moves more slowly than the grant window does.
The Real Risk Is Running Out of Time, Not Running Out of Funding
The most common failure we see is not rejection. It is timing out.
A business manager raises the idea in November and governors approve it in February. By then the installation diary is full and 31 March is weeks away. We hear the same frustration from schools and businesses alike: approval took months, and nobody mentioned that the voucher had a shelf life.
Education budget cycles make this harder, because spending decisions often wait for the spring term. The grant will not wait for the committee calendar, so the two need to run side by side.
Not sure where your site stands? Book a Free site survey
EV Charging Grants UK: Key Grant Details at a Glance
Two funded routes are open. Both are voucher schemes run by OZEV, and both changed on 1 April 2026.
| State-funded schools and colleges | Businesses and other workplaces | |
| Scheme | Workplace Charging Scheme for state-funded education institutions | Workplace Charging Scheme |
| Maximum grant per socket | £2,000 | £500 |
| Share of cost covered | Up to 75% of purchase and installation | Up to 75% of purchase and installation |
| Socket limit | 40 per institution | 40 per applicant, across all sites |
| Maximum grant | £80,000 per school | £20,000 per applicant |
| Two-socket example | Up to £4,000 | Up to £1,000 |
| Voucher validity | 180 days from issue | 180 days from issue |
| Scheme closes | 31 March 2027 | 31 March 2027 |
If you have seen £2,500 for schools or £350 for businesses quoted elsewhere, those were the rates before 1 April 2026. The schools rate went down and the business rate went up. The full detail is on GOV.UK for state-funded education institutions and for businesses and other workplaces.
For a school, the maths is compelling. In many cases the grant covers the majority of a standard installation, freeing budget for core educational priorities.
Why Schools and Businesses Choose DMS
- OZEV-approved. We are authorised to install under both schemes and to claim the grant on your behalf, so it comes straight off your invoice.
- NICEIC-registered. Our engineers work to BS 7671 and the IET Code of Practice for EV charging equipment installation.
- Experienced in schools. We have worked with schools since 2005, so we plan around the school day, not through it.
- Local to you. We cover London, Kent, Surrey, Essex, Hertfordshire and West Sussex.
- One company, no separate contractors. Survey, grant paperwork, installation and claim all sit with us. Your involvement is minimal once the initial decisions are made.
For more on the schools route, see our guide to how state-funded schools can secure up to £80,000.
Who Qualifies
These criteria are set by OZEV. We state them as published, not as promises.
School EV charger funding
- State-funded schools, academies, free schools, colleges and pupil referral units in England, Wales, Scotland or Northern Ireland.
- Designated off-street parking associated with the premises. It can be used by staff, visitors, parents or others.
- Multi-academy trusts apply separately for each school, and each school has its own 40-socket limit.
- Independent schools are not eligible for the schools rate. They apply under the standard Workplace Charging Scheme at up to £500 per socket.
Business EV charging grant eligibility
- A registered business, charity or public sector organisation.
- Dedicated off-street parking for staff or fleet use, clearly associated with the applicant.
- Up to 40 sockets in total, across all of your sites.
In both cases the work must be carried out by an OZEV-authorised installer. If any of these points are unclear for your site, check before you apply. An ineligible application costs weeks you may not have.
Step by Step: From First Enquiry to Working Chargepoint
- Book a free site survey. This is the logical, low-risk first step, with no commitment to proceed. One visit. One engineer. One clear report covering your electrical supply, parking layout, cable routes and any groundworks. Our guide to what a school EV charging site survey involves explains what to expect.
- Confirm eligibility and apply for your voucher. The online application is straightforward once you have your survey findings, your school reference number or company registration details, and your parking information to hand.
- Receive your voucher. Vouchers are typically issued within five working days of approval. The 180-day clock starts on the day the voucher is issued, not on the day you install.
- Approve the quotation. Because it is based on a survey of your actual site, the quotation reflects the real work required rather than a desk estimate.
- Installation and certification. A standard two to four socket installation usually takes one to two days on site, followed by testing, certification and commissioning.
- Grant claim. Your installer submits the claim and deducts the grant from the invoice. You pay only the balance.
Common Concerns, Answered
“We don’t have the time to manage a complex project.”
You should not have to. We handle the specification, the grant paperwork, the scheduling and the claim. Our job is to streamline, not burden, your workload.
“Our governors will want to see the numbers first.”
They should. Every survey ends with a written report setting out what can be installed, what it will typically cost and what the grant covers. It is governor-ready documentation you can take straight to your next meeting.
“We can’t have contractors disrupting the school day.”
A survey typically needs no electrical isolation and no downtime, and we arrange visits around your school calendar. Our engineers carry ID, follow your visitor sign-in procedures and provide DBS information on request.
What to Watch Out For
- Voucher expiry. A voucher lasts 180 days from issue, so apply when you are ready to install, not months before.
- Supply capacity surprises. Older school buildings and industrial units sometimes need a supply upgrade, which adds weeks. Only a site survey catches this early.
- Non-authorised installers. If your installer is not OZEV-authorised, the grant cannot be claimed. Check before you sign anything.
- Internal approval lag. Start governor or board sign-off in parallel with the survey, not after it.
- The new year rush. This is the scheme’s final year and installer diaries tighten as March approaches. A 31 March closing date really means a December decision.
Quick Checklist
- Confirm your site has off-street parking associated with your premises.
- Check which rate applies: state-funded education (up to £2,000 per socket) or standard workplace (up to £500 per socket).
- Have your school reference number (URN) or Companies House details ready for the application.
- Book a site survey before you apply, not after.
- Ask any installer for proof of OZEV authorisation and NICEIC registration.
- Map your approval dates against the 180-day voucher period and the 31 March 2027 closing date.
- Decide socket numbers with future demand in mind. The limit is 40 per institution or applicant.
- Put a December decision point in the diary.
Frequently Asked Questions
Can my school still get a grant for EV chargers before the scheme closes?
Yes. State-funded schools, academies, free schools and colleges can claim up to £2,000 per socket, covering up to 75% of costs, for up to 40 sockets. The scheme closes on 31 March 2027, so the practical requirement is a survey before the end of this term and an installation booked early in the new year. Independent schools apply under the standard Workplace Charging Scheme at up to £500 per socket.
How much is the workplace chargepoint grant worth for a small business?
The Workplace Charging Scheme covers up to 75% of purchase and installation costs, to a maximum of £500 per socket and 40 sockets per applicant. For a typical two-socket installation that means up to £1,000 off the total cost. Your installer deducts the grant from the invoice, so you pay only the balance.
How long does it take from site survey to a working chargepoint?
As a planning guide, allow two to three months from first enquiry for most sites. That covers the survey, the application and voucher, equipment lead time and diary booking, then one to two days on site for a standard installation. Sites needing a supply upgrade should allow longer, which is exactly why the survey comes first.
Why does my installer need to be OZEV-authorised?
OZEV only pays the grant for work completed by an installer it has authorised. Use anyone else and you lose the grant, whatever the quality of the work. NICEIC registration is a separate mark showing that an electrical contractor is assessed against UK safety standards, and it gives you the compliance paperwork your insurer, trust or local authority will ask for. DMS holds both.
Can a multi-academy trust apply across several schools?
Yes. Each school in a trust applies separately and has its own limit of 40 sockets, so a ten-school trust could access up to £800,000 in total. Each site needs its own survey and parking details. Coordinating the trust-wide approach early avoids repeating the approval process school by school against the same closing date.
The Next Step
You are reading this with the two things most applicants run out of: time to act and funding still on the table.
Work back from 31 March 2027. A survey this side of Christmas means an application in early January, a voucher within the week and an installation booked well before the spring rush. Leave it until the spring budget conversation and there may be no diary slot left before the scheme closes.
The schools and businesses that secure the grant are the ones that start the survey while the committee is still meeting. With the scheme in its final year, the time to act is now.
Book your free, no-obligation site survey or call 01322 420140. We will arrange a visit around your school or business calendar, and we will sort the rest for you.
Prefer to check the detail first?
Read more about EV charging installation for schools and EV charger installation for businesses.